網(wǎng)站首頁技術(shù)中心 > CD-800 Dicing Machine               Instruction
產(chǎn)品目錄
CD-800 Dicing Machine               Instruction
更新時(shí)間:2013-07-29 點(diǎn)擊量:3841

This type of machine is specialized in vegetable and cormcutting. It is easily operating for woman. It is also the necessary facility for restaurants and second processing factories. Instantaneous ability is above 15 people. This machine will let you have satisfied feeling.

 

A.   Processing material

    Potatoes, carrots, melons, bamboos, onions, apples, vegetables and so on.

 

B. Processing dimension:

(standard)

               H                 10. 15. 20mm cubes or bars.

L              T            (special dimension)

                             3-20mm cubes or bars.

 

C. Capacity

15/mm cubes;    1000kg/hr

 

D.   Voltage

3 phase / 415V, 50Hz / 4P / 0.75KW

(each countries has different voltage connection)

E.   Machine dimension & weight

L 800×W 700×H 1260mm

 

F. Cutting work outline

    Connecting “ON” switch, add little water when machine is running and put suitable amount of material to the machine. (Material diameter under 8/cm). Leaf blade will turn over the material to the fixed thickness of the place of flate cutter. And crosscut cutter will cut the bars into cubes and flow down to the machine after round cutter cuts material into bars. Easily operate, and processing material is clean and delicacy.

 

 

 

 

 

 

 

 

 

 

 

G. Voltage connection

    Power: 3 phase / 415V / 4P / 0.75KW. Connect power cord (red, black, white) when use the machine. Then connect (green) line to insurance after that start to operating.

 B

 

 

 

 

 

               A

 

(1) The power line A connected to power supply. (Attention the    motor shift)

(Attention 4 power lines, green for the grounding line.)

(2) Water pipeline will be connected B, then the installation is completed.

 

 

 

H.   Installing location

    Consider whether the water drains unimpededly or not when install the machine.

 

I.   Watch out the machine running

    Make sure there are no foreign objects on the entrance of the machine and inside of the leaf blade after connecting voltage to avoid the cutter broken while the machine running. Make sure the direction of leaf blade is correct, rith circum gyratoin (clock-wise).

 

J. Method of adjusting thickness of flate cutting

The standard allocation method as follows: (if cut cube is formed by three Cutter)

(1) The first knife (cutting thickness): Plane broadswords Z.     (Adjustable by cutting thickness)

(2)   The second knife (cutting width): Circular knife Group Y.

  5mmP (space): 5mm

 10mmP (space): 10mm

 15mmP (space): 15mm

 20mmP (space): 20mm

 

(3)   The third knife (cut length): transverse plane knife Group.

5mm uses 15 knife group

10mm uses 8 knife group

15mm uses 6 knife group

20mm uses 4 knife group

 

K.   Method of adjusting aluminum fence

Aluminum fence feeds material to crosscut cutter when round cutter cuts the material. This is why the sharp place of aluminum fence has to get close to the cushion of gap of round cutter or the dimension of aluminum fence marks on the bottom right side.

 

L. Round cutter discharging

Round cutter dimension drawing

Round cutter dimension

 

 

Standard (mm)

P: 10

P: 15

P: 20

Special (mm)

P: 3-20

(1) Avert black screw of fixed eccentric axis.

(2) Pull down the fixed bolt of round cutter eccentric axis. Then round cutter can be discharged.

(3) Fix the u-shape spanner on the round cutter set, then loosen sexangular on the round cutter axis (two sides of 24m/m spanner), then it can be taken out.

 

 

 

M. Crosscut cutter discharge

Crosscut cubes round piece

5m/m uses 21 pieces

10m/m uses 8 pieces

15m/m uses 6 pieces

20m/m uses 4 pieces

(1) Fix u-shape spanner on the fixed crosscut cutter set when discharge crosscut cutter. Then loosen sexangular screw (24m/m spanner), then it can be taken out.

 

N. Daily cleansing

    Clean the machine after finish the jobs. Run the machine while operating, then wash it by flush water to clean the leavings.

O.   Standard by-products:

Spanner         10, 19, 24………….3

Screwdriver (-), (+)……….……………2

U-shape spanner                 1 PCS

Lubricant oil                    1

Tool box                       1 box

主站蜘蛛池模板: 日韩不卡一区二区三区 | 思思玖玖玖在线精品视频 | 亚洲精品久久麻豆蜜桃 | 天天综合色天天综合色sb | 亚洲第一福利视频 | 国产精品欧美在线观看 | 99精品热线在线观看免费视频 | 精品国产福利在线观看一区 | 深夜国产在线 | 成人精品亚洲人成在线 | 热国产热综合 | 亚洲视频一区在线播放 | 我将她侵犯1~6樱花动漫在线看 | 国产拍拍拍 | 亚洲天堂岛国片 | 免费看一区二区三区 | 国产伦精品一区二区三区免 | 四虎免费在线观看视频 | 国产资源在线视频 | 色偷偷亚洲男人 | 毛片免费毛片一级jjj毛片 | 婚前试爱免费观看 | 国产区成人精品视频 | 午夜免费无码福利视频麻豆 | 日本特级a禁片在线播放 | 92国产福利久久青青草原 | 亚洲欧美综合在线观看 | 美女gif跪趴式抽搐动态图 | 大乳孕妇一级毛片 | 男人与雌性宠物交啪啪小说 | 国产精品合集一区二区 | 国产愉拍精品视频手机 | 色老板免费 | 99视频有精品视频免费观看 | 亚洲第一永久色 | 三年片韩国在线观看 | 国产男女爱视频在线观看 | 被巨大黑人的翻白眼 | 精品日韩一区 | 国产麻豆剧果冻传媒观看免费视频 | 和直男装修工在工地啪 |